Anderson Road Bridge
Cairns Qld, Construction, 2013
Bridge Engineer: Smec
Construction Engineer: Paterdis
Image: Mike Warren
Bridge Engineer: Smec
Construction Engineer: Paterdis
Image: Mike Warren
A 220T assembled steel trussed pedestrian bridge lifted into position by a dual crane arrangement. Paterdis were responsible for the structural design of the lifting beams at each end of the lift. The lifting beams were also used to secure the load during transport.
Paterdis
Structural
Engineering
Structural
Engineering
©2023 Paterdis Pty Ltd.
Website by Gangplank
Website by Gangplank